(1) Quality Control of Main Forgings: All valve components are forgings produced in strict accordance with forging process specifications and operation sheets. Parameters such as initial and final forging temperatures, degree of deformation, and deformation rate are strictly controlled, and cooling is carried out using methods specified in the process regulations. Finished forgings undergo chemical composition analysis, mechanical property testing, intergranular corrosion testing, and metallographic analysis; all results comply with the relevant standards.
Forging quality is ensured through ultrasonic and liquid penetrant inspections. Ultrasonic testing and evaluation are performed on 100% of the forgings in accordance with RCC-M requirements, and liquid penetrant inspection and evaluation are conducted on all forging surfaces.
(2) Welding: To enhance the quality of hardfacing, the plasma arc welding process is employed for the sealing surfaces of the valve disc and seat. Additionally, to guarantee welding quality, the welding procedures used in production have undergone re-qualification.
(3) Assembly and Testing: High-quality products require not only high-precision components but, more importantly, the ability to assemble these components into high-performance products. CNNC Suvalve organized a highly skilled assembly and commissioning team-comprising experienced technicians and senior skilled workers-to handle the assembly, commissioning, and testing of the valves. The team established detailed cleaning and assembly procedures, maintained strict quality control throughout the process, and strove for excellence to ensure successful assembly and commissioning. Various performance tests were conducted, and all indicators met the requirements of the design specifications.
(4) Process Inspection: A quality plan was developed for the valves to ensure quality control at every stage-including raw materials, input of forgings, machining, welding, heat treatment, non-destructive testing, cleaning, assembly, factory acceptance testing, and type testing. These processes were approved and witnessed on-site by the Nuclear Power Institute of China (NPIC).
Process Design of Check Valves
Sep 05, 2026
Leave a message
Send Inquiry
