Achieving a long service life and a maintenance-free period depends on several factors: normal operating conditions, maintaining a balanced temperature-to-pressure ratio, and accurate corrosion data.
Even when the ball valve is in the closed position, pressurized fluid remains inside the valve body.
Before maintenance: relieve pipeline pressure and place the valve in the open position; disconnect the power or air supply; and detach the actuator from the mounting bracket.
Disassembly operations must only be performed after verifying that pressure has been fully relieved from the upstream and downstream pipelines.
Exercise caution during disassembly and reassembly to avoid damaging sealing surfaces, particularly on non-metallic parts; use specialized tools when removing O-rings.
During assembly, flange bolts must be tightened symmetrically, gradually, and evenly.
Cleaning agents must be compatible with the ball valve's rubber, plastic, and metal components, as well as the working medium (e.g., fuel gas). If the working medium is fuel gas, gasoline (GB484-89) may be used to clean metal parts; clean non-metallic parts with pure water or alcohol.
Remove non-metallic parts from the cleaning agent immediately after cleaning; do not allow them to soak for extended periods.
After cleaning, allow the cleaning agent to evaporate from the surfaces (or wipe dry with a clean, dry silk cloth) before assembly; do not leave parts exposed for too long, as this may lead to rusting or contamination by dust.
New parts must also be thoroughly cleaned prior to assembly.
During assembly, ensure that no metal shavings, fibers, grease (unless specified), dust, or other impurities/foreign matter contaminate, adhere to, or remain on part surfaces or inside the valve cavity. If minor leakage occurs at the packing area, retighten the stem nut.

